Felix Bulnes Clinical is a state of the art hospital that will soon serve thousands, and the eye of every political party in Chile will be paying close attention to how this center will revolutionize public health for the Metropolitan Region.

The construction of this new hospital started in 2014 and was scheduled to be delivered to the public on September 2018, but multiple delays in construction are making this a public problem, and the government is pressuring to have the job finished.



Our units were able to comply with all the specs and be greenlighted by the specifying engineers as well as pass all the stages of approval from the government to be the main air handler brand in the building. These units will be providing 180.000 CFM with 84 AVS Units, but that wasn’t the only point that won us the job, lead time was a key factor as everything now needs to move quickly and precisely. Both of these points are something that VTS America can provide as we maintain our quality thought out all of our units.